Camp Nazareth Residence Addition Block/Footer & Floor

Finishing up the block work.

Tarps needed to prevent the ground from caving in from the rain.

With the church in the background, a block worker surveys a job well done.

It was great to see the block work go so well.

Making sure the block work was done right.

The block work was done in just a few days.

Say hello to the fellas who did the block and footer work.

Each joist was a step closer to have a floor to walk on.

Inspector Joshua looks over Lee's work.

Lee getting ready to set a plate on the block.

Another view of the joists being set.

22 ounce hammer + several hundred nails+ sweat = a floor

The Church watches over every step of the project.

A little bit of hammer & nail work.

The floor begins to take shape.

Putting in the joists for the floor.