Camp Nazareth Residence Addition Basement and Slab

Almost done, after four days of struggling with the sturdiest foundation ever built.
Lee watches as the block wall "comes a crumbling down."
Even the Bobcat with a jackhammer on it struggled to take down the wall.
Trying to get through the garage wall and into the basement was like trying to break into Fort Knox.
Working on pouring the slab in the basement.
The slab in the basement was poured through the basement window openings.
The mixer.
Nice work on the finished slab.
Basement after the slab was poured and plumbing was being installed.
Stairs to and from the basement.
Part of the interior rough framing.
Beginning to tie into the existing portion of the residence.